• +962 7 7018 6638

Other Factory Start-up

03 January 2018

JBMETERS Ltd also has the specialist knowledge and expertise to allow technology transfer for other electronic devices and can offer a full range of services including; feasibility studies, design / customisation, project conceptualisation, equipment procurement, component procurement, local training, quality control services and marketing/customer support.

Production
JBMETER Scan provide the services for identifying all the processes/stages required for other electronic devices, whether it is a simple set of an SMT line to product design and certification.
 JBMETER Shas the skills to provide Dependability-Reliability prediction.

Transformer factory Start up

JBMETERS Ltd also has the specialist knowledge and expertise to allow technology transfer for a transformer factory start-up.
JBMETERS offer a full range of services including; feasibility studies, meter design / customisation, project conceptualisation, equipment procurement, component procurement, local training, quality control services and marketing/customer support. Although the preferred approach is the gentle immersion into technology over time, commercial considerations such as import duties often force a deeper technology start up. For greater detail of the services available for a factory start-up please refer to the information given in the Electricity Meter factory start-ups.

Transformers have a vital role in electrical systems as they are a means of “stepping down” the current/voltage in a system to measurable values. We would enable you to manufacture medium (10Kv) and high (33Kv) transformers. Such transformers have many industrial applications e.g. power lines.

Tests on voltage transformers and current transformers (needed to meet certain standards)

  • Accuracy tests – This is to determine whether the errors of the voltage transformer are within specified limits.
  • Dielectric insulation tests
  • Temperature rise tests
  • Circuit tests
  • Verification of terminal markings and polarity

KIGG is able to offer a wide range of services for a Transformer factory start-up including:

Feasibility Studies

This study will rationally uncover whether your project is viable. There are many aspects to investigate including; technology and system, operational and schedule feasibility. The results from the feasibility studies will be detailed in a feasibility study report. The feasibility study report will detail the evaluation criteria, the findings and our recommendations.

Transformer Design

We can tailor the design of the transformer to your individual requirements.

Transformer Standards

We can make sure that you manufacture the transformers to international standards.

Production

We will assist in identifying all the processes/stages required for water meter manufacturing and therefore we can determine the best design/layout of the factory and the equipment that you will require.

Testing and Calibration

Testing and Calibration will be required to ensure that the transformers are working and that they are functioning correctly. The calibration equipment required will vary depending on the type of transformers that are being manufactured.

Quality Control

We will implement quality control procedures throughout the transformer manufacturing process to ensure
If any of the transformers at any stage fail to meet these rigorous requirements, the transformer will be sent to the repairs department.

Contact Us

Jordan Office

Amman 11810

Amman, Swefieh.
Izz Ben Abelsalam st.
Building No. 16
Office No. 7

Tel      : +962 (6) 5810757
Mobile : +962 7 7018 6638
Email  : This email address is being protected from spambots. You need JavaScript enabled to view it.

United Kingdom Office

Tel      : +44 (0) 1446 743377
Fax     : +44 (4) 5601 258134
Email  : This email address is being protected from spambots. You need JavaScript enabled to view it.

Recent Works

Send Us A Message

  Mail is not sent.   Your email has been sent.